Project Summary
Saulsbury performed the electrical and instrumentation construction for an electrical upgrade at a client’s pipeline terminal in Post, Texas. Our team installed the raceways, equipment, wiring, terminations, lighting, and instrumentation for the project.
The scope of the project also included:
- Conversion of utility power from 2400 volts to 4160 volts
- Installation of new reclosers and M-Force switches
- Installation of new 4160-volt, 480-volt MCC and a 500 kilovolt-amps transformer
- Replacement of the existing 600-horsepower mainline pump to the new 700-horsepower pump
- Replacement of the existing 2400-volt, 75-horsepower booster with two 480-volt, 60-horsepower booster pumps
- Two – 30-horsepower mixer motors
- Re-feeding of all equipment from the original electrical building and outdoor equipment racks to the new electrical building