—
Project Summary
Saulsbury was awarded a contract for the construction of a 200-MMSCFD compressor station for one of the Permian Basin’s most active operators. The station consists of six ~5,000-HP engine driven 3616 compressors with future expansion capability, two 3516 compressors, plus slug catching, liquids handling, and dehydration.
In addition to performing all fabrication and construction for this project, Saulsbury delivered a fully assembled pipe rack and equipment modules to expedite field construction and maximize efficiency. From the first foundation to the last instrument and final coat of paint, Saulsbury employees provided the turnkey construction services and expertise for this impressive station.